DBK Drymatic Boost Bar FGPH108 Buku Petunjuk - Halaman 10
Jelajahi secara online atau unduh pdf Buku Petunjuk untuk Pengering DBK Drymatic Boost Bar FGPH108. DBK Drymatic Boost Bar FGPH108 18 halaman. Adaptable heat drying system
Set up Guide— 2-Port Adaptor (38mm)
The Drymatic Boost 12-Port Adaptor is designed to split the heated airflow in to 12 separate channels; these can then be
diverted in to difficult to reach areas such as kitchen cabinetry, wall and ceiling voids and subfloor spaces.
Step 1— Connect Adaptor
Take the adaptor and slide it in to either side of the Drymatic Boost Bar. The adaptor will locate itself between the ribbed
features in the outlet of the Boost Bar.
Step 2— Connect Hoses or Lay Flat Ducting
38mm Pipes and Plastic Cuffs
Each port is 38mm and we recommend that users only fit the attachments supplied by DBK for the device.
The adaptor is supplied with a kit containing black plastic cuffs, 38mm plastic hose and rubber bungs to seal off the end of
each pipe if required.
Take one Plastic Cuff and connect it to the end of the Black 38mm pipe provided. The plastic cuff will then slide over the
38mm outlets of the Boost Bar adaptor, no additional fixing is required. Connect each hose to the machine following the
same method.
Using a 44mm hole cutter attachment drill a hole in the material that needs to be dried, such as the base of a kitchen cabi-
net. Connect a black plastic cuff to the end of the 38mm hose and insert it into the hole created. It is recommended that an
additional hole(s) be created to allow the warm, wet air to escape the void/cavity
38mm Lay Flat Ducting
The unit is designed to accept lay-flat ducting and this can be attached to the unit using cable ties or another appropriate
form of fixing. The lay-flat ducting should be cut to the required length and either be fed in to the tented chamber/area
that is being targeted or tied off at its end and perforated to allow air to escape along the length of the duct.
Step 3— Power the Boost Bar
Switch on the Air Mover and then switch on the Boost Bar.
Press the 'Settings' button and press the 'Reset' button to clear the kWh and Hours Run from the previous job
Enter the desired maximum Air Off Temperature and Current Limit (if applicable)
Press the 'Green Tick' icon to accept changes. The machine will return to the Home screen
Press the 'Green Play' icon to start the Boost Bar.
The unit will now begin heating the airflow passing through the Boost Bar
9