Galvo Shed GVO 1515 Manual Petunjuk Perakitan - Halaman 2
Jelajahi secara online atau unduh pdf Manual Petunjuk Perakitan untuk Penyimpanan Luar Ruangan Galvo Shed GVO 1515. Galvo Shed GVO 1515 8 halaman. Sloping roof shed
COMPONENTS CHECKLIST
Please check all components carefully and advise your supplier immediately if any discrepancies.
Remember to quote the code on the front page.
1 x 1920 x 780mm door sheet
A
2 x 1830mm sheets for the roof
D
4 x 1485mm 'U' channels
G
for end walls
2 x 780mm 'U' channels (door top
J
and bottom)
1 x 310mm door plate
M
IMPORTANT!
• Remove the swarf (drill filings) from the panels as you assemble them.
• All components are cut to length. Do not cut any parts unless instructed.
• Fixings through the inside of the channels into the sheeting are just as important as
fixings from the outside.
RIBS AND PANS
• Generally most fixings are spaced at 300mm apart.
• Keep the fixings in the pans as close to the ribs as possible for added strength.
• Ribs will always protrude to the outside of the shed.
• Extra internal fixings are strongly recommended in high wind areas.
BUILDING YOUR SHED
• The basic task is to join the sheets together to
form your panels, and fix channels to the top
and bottom of these panels. They will then join
together to form your shed (diagram 1, 2, and 3).
2
1 x narrow 1980 x 715mm sheet
B
for front wall, beside door
4 x 1980-1830mm sloping sheets
E
(2 left, 2 right)
2 x 1920mm 'U' channels
H
for door sides
2 x 1830mm 'L's for flashing the
K
roof to the side walls
1 x pack screws with padbolt
N
1 x pack of rivets and hinges
DIAGRAM 1
1
2 x 1830mm sheets for back wall
C
6 x 1515mm 'U' channels for front,
F
back and roof
2 x 793mm 'U' channels
I
(door spacers)
2 x 1980mm 'Z' door jambs. (1 length
L
has 'U' channel attached)
Door bracing
O
PAN
DIAGRAM 2
If you choose to vary from these instructions your warranty will be impaired
RIB
DIAGRAM 3