AFL Hyperscale U Series Panduan Instalasi - Halaman 8

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Perangkat Keras Komputer AFL Hyperscale U Series. AFL Hyperscale U Series 16 halaman. Front-access v-panel
Juga untuk AFL Hyperscale U Series: Panduan Instalasi (8 halaman), Panduan Instalasi (8 halaman), Panduan Instalasi (8 halaman), Panduan Instalasi (12 halaman), Panduan Instalasi (8 halaman), Panduan Instalasi (8 halaman), Panduan Instalasi (20 halaman), Panduan Instalasi (17 halaman), Panduan Instalasi (20 halaman), Panduan Instalasi (16 halaman)

AFL Hyperscale U Series Panduan Instalasi
Cable Installation
Remove tape from the tube, feed nylon
10
braid onto fiber towards cable, and remove
tube from fiber.
Hose
Clamps
Attach cable to clamp with hose clips and
12
place braid tails into slots.
8
© AFL Hyperscale. All rights reserved
25mm/1"
approx.
Repeat steps 6-10, ensuring all fiber has braided
11
sleeve and tape braid sleeve at cable jacket end.
Cable
Braids
Position and screw cable breakout unit onto
13
side of panel.
Tape
Series