AFL Hyperscale 20RU Panduan Instalasi - Halaman 10

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Peralatan Industri AFL Hyperscale 20RU. AFL Hyperscale 20RU 20 halaman. Mass-fusion splice cabinets

Cable Installation
18
.
Repeat the cable prep for the outbound cables.
a
Loosen the thumb screws and remove the work
19.
tray (D) from cover (C).
10
© AFL Hyperscale. All rights reserved
18
.
NOTE: Cables can feed from both the top
b
and the bottom.
Slot the work tray (D) into mounting plate (A)
20.
and tighten the thumb screws. Multiple
positions are available.