AFL Hyperscale 20RU Panduan Instalasi - Halaman 11

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Peralatan Industri AFL Hyperscale 20RU. AFL Hyperscale 20RU 20 halaman. Mass-fusion splice cabinets

Cable Installation
21.
Remove the splice tray (G) cover
5 coils, approx.
1.5m (5ft) (both
144f ribbon
and 36f single
element)
Route the incoming/outgoing fiber as per above image - up to 1.5m (5ft) of 144f Ribbon fiber per side.
22.
Splice according to the splice schedule.
Latch / Tab
Splice Schedule
Label
Fiber Retainer
Clips
20RU & 37RU Mass-Fusion Splice Cabinets
Latch / Tab
© AFL Hyperscale. All rights reserved
11