AFL Hyperscale U Series Panduan Instalasi - Halaman 14

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Penyimpanan AFL Hyperscale U Series. AFL Hyperscale U Series 20 halaman. Front-access v-panel
Juga untuk AFL Hyperscale U Series: Panduan Instalasi (8 halaman), Panduan Instalasi (16 halaman), Panduan Instalasi (8 halaman), Panduan Instalasi (8 halaman), Panduan Instalasi (12 halaman), Panduan Instalasi (8 halaman), Panduan Instalasi (8 halaman), Panduan Instalasi (17 halaman), Panduan Instalasi (20 halaman), Panduan Instalasi (16 halaman)

AFL Hyperscale U Series Panduan Instalasi
Cable Installation
Re-fit drawer cover, ensuring cable braid tail
27
passes though cut-out (use cut-out on right-
hand-side for alternate side cable entry).
Slide drawer back out to fully extended, gently
29
pull braid tail to straighten, and make slack
coil, securing with Velcro as shown.
14
© AFL Hyperscale. All rights reserved
Ensure drawer runners
are retracted
Ensuring drawer runners are retracted, slide
spliced drawer into bottom runner position of
28
6RU housing - an audible click sounds when
runners are engaged.
Push/Pull Handle
Push drawer back into panel so that it is fully
30
retracted.
Series