AFL Hyperscale U Series Panduan Instalasi - Halaman 11

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Perangkat Keras Jaringan AFL Hyperscale U Series. AFL Hyperscale U Series 16 halaman. Front-access v-panel
Juga untuk AFL Hyperscale U Series: Panduan Instalasi (8 halaman), Panduan Instalasi (8 halaman), Panduan Instalasi (8 halaman), Panduan Instalasi (12 halaman), Panduan Instalasi (8 halaman), Panduan Instalasi (8 halaman), Panduan Instalasi (20 halaman), Panduan Instalasi (17 halaman), Panduan Instalasi (20 halaman), Panduan Instalasi (16 halaman)

AFL Hyperscale U Series Panduan Instalasi
Cable Installation
Re-fit drawer cover, ensuring cable braid tail
20
passes though cut-out. Use cut-out on right-
hand-side for alternate side cable entry.
Slide drawer back out to fully extended, gently
22
pull braid tail to straighten, and make slack
coil, securing with Velcro as shown.
Series
U-Series 2RU Front-Access V-Panel (FVP)
Ensure drawer runners
are retracted
Ensuring drawer runners are retracted, slide
21
spliced drawer into runner of 2RU panel – an
audible click sounds when runners are engaged.
Push/Pull Handle
Push drawer back into panel so that it is fully
23
retracted.
© AFL Hyperscale. All rights reserved
11