Mainsboost Charger MBC 200SV Panduan Petunjuk Pemasangan, Pengoperasian & Pemeliharaan - Halaman 10

Jelajahi secara online atau unduh pdf Panduan Petunjuk Pemasangan, Pengoperasian & Pemeliharaan untuk Pompa Air Mainsboost Charger MBC 200SV. Mainsboost Charger MBC 200SV 20 halaman. Multi water performance system

3) Your charger will have been supplied with either a green energy lever valve
and check valve to suit the main water supply size of (22, 28 or 35 mm).
Having ensured the stopcock is turned off and (if installing on an existing
Mainsboost system) drained it, remove a section of pipe to allow fitting
of 2 tee pieces (not supplied), the lever valve and check valve (Fig. 6).
4) The Charger unit has been designed to allow pipework connections to be
made in the most convenient way, select the best route.
5) Ensure the PRV is securely fitted and connect the flexible hoses provided,
routing them to the desired case exit points (Fig. 6).
6) Care should be taken not to kink the hoses or bend them through an angle
greater than 30
7) Route 15 mm feed and return from the tees inserted in the main, passing
through the isolating valves supplied and the check valve (fitted in the feed
line only) (Fig. 6).
8) Ensure grommets are fitted correctly in all case appetures to ensure the
pipework does not vibrate against the case (Fig. 6).
Isolating valve
Pressure reducing
valve (PRV)
Stopcock
Pressure
gauge
Check valve
Stainer
Fig. 6
.
o
Isolating valve
PRV
Isolating
valve
Check valve
- 10 -
Cont ...