Kohler Archer K-1125 Panduan Instalasi dan Perawatan - Halaman 14
Jelajahi secara online atau unduh pdf Panduan Instalasi dan Perawatan untuk Bak mandi Kohler Archer K-1125. Kohler Archer K-1125 29 halaman. Flanged acrylic bath with integral apron
Juga untuk Kohler Archer K-1125: Spesifikasi (2 halaman), Panduan Instalasi dan Perawatan (25 halaman), Panduan Instalasi (21 halaman)
3.
Secure the Bath – Leveling Block Models
Clear spaces for leveling blocks.
Dégager les espaces pour les
blocs de mise à niveau.
Limpie los espacios para los
bloques niveladores.
Spread a 2" (5.1 cm) layer of cement or
mortar bed material.
Étaler un lit de ciment ou de mortier,
d'une épaisseur de 2" (5,1 cm)
Extienda una capa de 2" (5,1 cm) de
cemento o mortero.
WARNING: Risk of personal injury. Do not lift the bath by the rim. Lift the bath
from the bottom only.
NOTICE: The bath must be secured using one of the following three methods:
cement or mortar bed, construction adhesive, or silicone sealant.
NOTICE: Ensure the subfloor is level before proceeding. If necessary, use shims to
achieve level.
Cement or Mortar Bed Method
NOTICE: Do not use gypsum cement or drywall compound, as these materials will
not provide a durable bond. Only use cement or mortar.
Spread a 2" (5.1 cm) thick later of cement or mortar on the subfloor except where
the leveling blocks will be located.
Clear any cement or mortar away from the leveling block locations.
Place a plastic liner or similar material over the cement or mortar.
With help, carefully move the bath into the installation area.
Verify the leveling blocks are resting directly on the subfloor. Reposition as
needed.
Verify the bath is level across the top of the bath. If the bath is not level, shims
must be used under the leveling blocks.
Connect the drain tailpiece to the trap.
Construction Adhesive Method
Apply a generous amount of high-quality construction adhesive to the bottom of
the leveling blocks.
With help, carefully move the bath into the installation area.
Verify the leveling blocks are resting directly on the subfloor. Reposition or shim
as needed.
Verify the bath is level across the top of the bath. If the bath is not level, shims
must be used under the bath.
1084212-2-C
Rim
Rebord
Borde
Leveling Blocks
Blocs de mise à niveau
Bloques niveladores
10
Kohler Co.