Kohler K-1112P Panduan Instalasi - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Bak mandi Kohler K-1112P. Kohler K-1112P 48 halaman. Bath with airjets and integral apron canada
Juga untuk Kohler K-1112P: Panduan Instalasi (48 halaman)
Before You Begin (cont.)
Please read these instructions carefully to familiarize yourself with the required tools, material, and
installation sequences. Follow the sections that pertain to your particular installation. This will help
you avoid costly mistakes. In addition to installation instructions, read all operating and safety
instructions.
Inspect the bath with airjets for damage before you begin installation.
You must install this bath to an adequately supported, level subfloor.
Confirm adequate mounting and connection space for the faucet specified for your installation.
An optional accessories kit is available for relocating the blower motor. Refer to the back cover for
contact information if this kit is desired but was not ordered. If relocating the blower motor, follow
the instructions that came with the kit while performing this installation.
Kohler Co. reserves the right to make revisions in the design of products without notice, as specified
in the Price Book.
Kohler Co.
5
1040293-2-E