Kohler K-11344 Panduan Instalasi dan Perawatan - Halaman 7

Jelajahi secara online atau unduh pdf Panduan Instalasi dan Perawatan untuk Bak mandi Kohler K-11344. Kohler K-11344 28 halaman. Freestanding bath
Juga untuk Kohler K-11344: Panduan Instalasi dan Perawatan (45 halaman), Panduan Instalasi (25 halaman), Manual Pengasahan Awal (Roughing-In) (4 halaman)

Kohler K-11344 Panduan Instalasi dan Perawatan
6. Secure Remaining Foot Clips (Without Shroud)
Reposition the bath so the two posts located on the bath frame fit into the installed foot clips. Do
not move the locking plates into the locked position on the two foot clips mounted to the floor.
Make sure the locking plate screw hole faces the outside of the bath on each of the two remaining
foot clips.
Trace the outline of the two remaining foot clips.
Lift the bath and set it aside.
Repeat the previous steps to remove, mark, drill, and secure the two remaining foot clips.
Kohler Co.
Unlocked
Position
Bath
Front
7
1207307-2-B