360 Vision Visiondome-VR Panduan Instalasi & Konfigurasi - Halaman 15

Jelajahi secara online atau unduh pdf Panduan Instalasi & Konfigurasi untuk Kamera Keamanan 360 Vision Visiondome-VR. 360 Vision Visiondome-VR 16 halaman.

360 Vision Visiondome-VR Panduan Instalasi & Konfigurasi
Visiondome VR Installation Manual Ver 2.7

11 Storage and Handling

Visiondome VR unit should be handled with care and must not be dropped. When the Visiondome VR is inside
the transit packaging which is used for despatch from the factory, they should not be stacked to a height of more
than two.
When Visiondome VR units are being stored before installation they should be kept in the transit packaging
and located in a dry indoor environment preferably between 1°C and 35°C which is dry and dust free. Humidity
should be such that water vapour is non-condensing. Visiondome VR unit can be allowed to be outside this
range for short periods of time (24 hours maximum) for transport (e.g. in aircraft or vans) but must never be
allowed to be outside the normal operating temperature range of -40°C to +60°C even during storage.
Before installation the Visiondome VR should be clean and dry. (If necessary it should be cleaned and dried
taking care that the cover is not scratched).

12 Warranty

This information and/or any technical information – whether received verbally or writing – is given in good faith
but without warranty and this also applies where proprietary rights of third parties are involved. The information
provided does not release you from your obligation to check its validity and to test the products suitability for
the intended purpose(s) and use(s). The application, use and installation of the products either in isolation or in
conjunction with other products used, provided and installed by you on the basis of the technical advice issued
are beyond our control and therefore remain entirely your own responsibility.
©2017 ALL DESIGNS AND SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE
© 360 Vision Technology Ltd.
Page 15