Miele Imperial DWA 956-2 EX Petunjuk Pengoperasian dan Pemasangan - Halaman 23
Jelajahi secara online atau unduh pdf Petunjuk Pengoperasian dan Pemasangan untuk Kap Ventilasi Miele Imperial DWA 956-2 EX. Miele Imperial DWA 956-2 EX 37 halaman.
– Drill 4 further holes 8 mm Ø through
the now fitted retaining plate.
– Provide the two top holes with S8
plugs and 5 x 40 mm screws, the
two bottom holes with S8 R60 plugs
and 5 x 60 mm screws . Screw the
bottom screws in only loosely so that
they can later be used to secure the
vapour canopy.
– Hold retaining plate B up to the wall
and push up until directly below the
ceiling. Use the notches and the
centre line to align it horizontally.
Mark the positions for the holes to be
drilled on the wall.
– Drill four 6 mm Ø holes into the wall,
and push the S6 plugs into the holes.
– Screw on the retaining plate with four
4 x 30 mm screws and four 4.3 mm
washers.
Retaining plate C only needs to be
fitted if dimension Y is greater than 400
mm. It provides greater stability for the
extension piece.
– Hold the retaining plate C at a maxi-
mum distance of 400 mm from the
ceiling and use the two notches to
align it with the centre line. Mark the
position of the two drill holes.
– Drill two 6 mm Ø holes into the wall,
and press the S6 plugs into the
holes.
– Screw on retaining plate C with two
4 x 30 mm screws and two 4.3 mm
washers.
23