ABB ACH580-01 Series Petunjuk Manual - Halaman 3
Jelajahi secara online atau unduh pdf Petunjuk Manual untuk Peralatan Industri ABB ACH580-01 Series. ABB ACH580-01 Series 7 halaman. Base drive replacement
Juga untuk ABB ACH580-01 Series: Manual (16 halaman), Panduan Instalasi dan Start-Up Cepat (17 halaman), Petunjuk Manual (8 halaman), Panduan Instalasi dan Start-Up Cepat (17 halaman), Panduan Instalasi dan Start-Up Cepat (17 halaman)
REPLACEMENT INSTRUCTIONS | ACH580-01 VXR UL TYPE 1 , R2/R3/R4
Step
Instruction
5
A
Cut zip ties
by pulling out the terminal block.
NOTE: Remove any additional drive I/O wiring.
6
R4 Frame: Remove zip ties securing the input and output wires to
the drive conduit plate.
7
R2 & R3 Frame: Using a PZ2 bit, loosen and remove wires from the
input and motor terminals of the drive.
R4 Frame: Using a T20 bit, loosen and remove wires from the input
and motor terminals of the drive.
Using a PZ3 bit, loosen and remove ground wire from the drive.
8
R2 Frame: Using a T20 bit, loosen and remove two (2) M4x8 screws.
Remove conduit assembly.
R3 Frame: Using a T20 bit, loosen and remove four (4) K40x12
screws. Remove conduit assembly.
R4 Frame: Using a T25 bit, loosen and remove four (4) M5x16
screws. Remove conduit assembly.
and disconnect the RS485 cable
Diagram
B
from the drive
A
B
A
3