ABB ACH580-01 Series Panduan Instalasi dan Start-Up Cepat - Halaman 8
Jelajahi secara online atau unduh pdf Panduan Instalasi dan Start-Up Cepat untuk Peralatan Industri ABB ACH580-01 Series. ABB ACH580-01 Series 17 halaman. Base drive replacement
Juga untuk ABB ACH580-01 Series: Manual (16 halaman), Panduan Instalasi dan Start-Up Cepat (17 halaman), Petunjuk Manual (8 halaman), Petunjuk Manual (7 halaman), Panduan Instalasi dan Start-Up Cepat (17 halaman)
Default I/O connections (HVAC default configuration)
Total load capacity of the auxiliary voltage output +24V (X2:10) is 6.0 W (250 mA / 24 V DC).
Terminals
+24V, DGND, DCOM, B+, A-, DGND, Ext. 24V
DI, AI, AO, AGND, RO, OUT, IN, SGND
Safe torque off (STO). Both circuits must be closed for
the drive to start. The drawing shows the simplified
connection of a safety circuit through safety contacts. If
STO is not used, leave the factory-installed jumpers in
place. See also section Safe torque off (STO).
R6... R9 only: Ext 24V AC/DC input to power up the
control unit when the main supply is disconnected.
Wire size
2
0.2 ... 2.5 mm
(24 ... 14 AWG)
2
0.14 ... 1.5 mm
(26 ... 16 AWG)
Tightening torque
0.5 ... 0.6 N·m (5 lbf·in)
8