Aquatek ATUN Series Panduan Pengoperasian & Pemeliharaan - Halaman 6

Jelajahi secara online atau unduh pdf Panduan Pengoperasian & Pemeliharaan untuk Sistem Penyaringan Air Aquatek ATUN Series. Aquatek ATUN Series 10 halaman. Upflow neutralizers

Pre-Installation Checklist
1. Installation site is level, clean & cleared of obstuctions.
2. It is recommended* a working pressure reducing valve be installed on the inlet water line that supplies the wa-
ter filter.
3. Note: The warranty is void if the system is exposed to water pressure in excess of 100 psi and/or water tem-
peratures in excess of 110° F
4. Important: Protect your Fitler and the entire drainline from freezing temperatures. The temperature at the loca-
tion of the system should never be below 40° F
WARNING! DANGER: If your unit should freeze, do not attempt
Installation
1. Floor Space: Make sure the floor space that has been selected to install the system is clean and on a
level surface. In some cases, your media may be shipped seperatelty. (see next page)
2. Installation Sequence (Fig 1): Refer to Typical Installation Sequence for correct placement of neu-
tralizer in relationship to other water treatment devices. Installa- tion location is critical because it may
change the effectiveness of other products.
3. Leveling the System: Mineral tanks are fitted with an adjustable leveling base, if tank is not vertical/
straight lift tank 1-3 inches off the floor and gently release tank back on to the floor (repeat until stright
up and down).
4. Shut off: Be sure to shut off water at main supply. On a private well system, turn off power to pump
and drain pressure tank. Make certain pressure is re- lieved from complete system by opening nearest
faucet to drain system. Shut off fuel supply to hot water heater.
3. Bypass & Connection Kit: Locate the bypass valve and connect to the head assembly. Assemble
the connection fittings and connect to the bypass valve. Tighten the connection nuts on both the by-
pass and connections fittings by hand only. Closeboth the inlet and outlet valves on the bypass and
leave in closed position until instructed otherwise.
4. Plumbing Preparations: Refer to diagram (Figure 2) for recommended plumbing procedure. Cut
main supply line as required to fit plumbing to the inlet and outlet of neutralizer. Use thread tape on
nipple threads, as most pipe thread pastes will cause deterio- ration of plastic fittings. Hold nipples
with wrench while attaching plumbing. DO NOT OVERTIGHTEN. If a boiler drain (not supplied) is to be
connected, be sure to install it on the outlet side of the ATUN Series Upflow Acid Neutralizer System.
Note: All plumbing should be done in accordance with local plumbing codes
6

Installation Guide

to disassemble it. Call us first 877-414-PURE
UNITED WATER INC.
A
AtuN-S
quAtek
u
G
erieS
Ser
uide
.