Akron 1494 Petunjuk Pemasangan, Pengoperasian, dan Pemeliharaan

Jelajahi secara online atau unduh pdf Petunjuk Pemasangan, Pengoperasian, dan Pemeliharaan untuk Produk Pipa Akron 1494. Akron 1494 12 halaman. Electric ladder pipe, nozzle

INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
The following is intended to provide the basic instructions for installation, operating and maintenance of the
Electric Ladder Pipe & SaberMaster Nozzle.
TOOLS REQUIRED FOR INSTALLATION OF ELECTRIC LADDER PIPE
• Utility knife
• Medium Phillips screwdriver
• Small Phillips screwdriver
• Electrician's pliers (multipurpose,
stripping and crimping)
PRODUCT RATINGS FOR ELECTRIC LADDER PIPE
Maximum motor current draw:
12 volt versions
24 volt versions
Normal operating current (depending on operating conditions—pressure, flow, etc.):
12 volt versions
24 volt versions
Minimum Voltage:
All 12 volt motors: 11.5 volts
All 24 volt motors: 23 volts
Mass: 30 lbs. (13.6 kg)
Maximum Flow: 1000 GPM
Maximum Pressure: 200 PSI
Noise Emission: 93 Db @ 1m with maximum flow
STYLE 1494 ELECTRIC LADDER PIPE
& STYLE 1577 SABERMASTER™ NOZZLE
(
Versions Available)
14.0 amps for elevation motor
3.0 amps for nozzle pattern motor
7.5 amps for elevation motor
1.5 amps for nozzle pattern motor
3 - 10 amps for elevation motor
0.7 amps for nozzle pattern motor
2 - 5 amps for elevation motor
0.4 amps for nozzle pattern motor
117299 & 119210
• Medium flat screwdriver
• Small flat screwdriver
1
inch hex head wrench
2
3
Allen Wrench
1 6