Anzzi JETSON FT-AZ087 Manuale di installazione e funzionamento - Pagina 7

Sfoglia online o scarica il pdf Manuale di installazione e funzionamento per Vasche da bagno Anzzi JETSON FT-AZ087. Anzzi JETSON FT-AZ087 12. Air jetted freestanding bathtub with chroma-lights

Anzzi JETSON FT-AZ087 Manuale di installazione e funzionamento
* All JERICHO bathtubs are 100% water tested at the factory and certified to be free
of leaks. T ransportation and mishandling may cause leaks. It is necessary to test the
bathtub while there is access to all sides of the bathtub.
TEST THE BATHTUB WHILE YOU HAVE ACCESS TO THE
BOTTOM AND BEFORE PERMANENTLY INSTALLED.
READ AND FOLLOW ALL INSTRUCTIONS
Place the tub on a completely flat surface in an area where it may be drained after testing.
Close the drain and fill the tub about half way.
Allow the water to stand in tub for 30 minutes and then inspect all plumbing and seals for leaks.
Supply power to unit and run for 10 minutes and inspect for leaks.
NOTE: IF THE PUMPS DO NOT OPERATE, CHECK THE BREAKER TO ENSURE POWER IS ON AND THE CABLE CONNECTING THE
CONTROLS TO THE PUMP IS ATTACHED.
WARNING!
DO NOT RUN THE PUMP UNLESS THE TUB IS FILLED WITH WATER TO PROPER LEVEL.
DAMAGE DUE TO DRY RUNNING PUMPS IS NOT COVERED UNDER WARRANTY. FAILURE TO
PERFORM THESE TESTS BEFORE INSTALLATION WILL MAKE THE INSTALLER LIABLE FOR FUTURE
REPAIR COSTS.
Have questions? Call us at
1-844-44-ANZZI
or visit us at
www.ANZZI.com
7