DANLERS CEPH RE Note sull'installazione - Pagina 2
Sfoglia online o scarica il pdf Note sull'installazione per Interruttore DANLERS CEPH RE. DANLERS CEPH RE 2. Ceiling socket mounted photocell switches
Installation procedure
1. Please read these notes carefully before commencing work.
In case of doubt please consult a qualified electrician.
2. Make sure the power is isolated from the circuit.
The Photocell should be plugged into a Klik-AX socket connected
as shown in diagram A:
L
Live in
N
Neutral in
A
Switched Line out
3. DANLERS sell the Klik-AX sockets under the following codes:
CESO:
Circular Klik-AX socket for Besa box
CESO SQ: Square Klik-AX socket for single gang back box
4. Switch on the supply and check the operation.
Lux set-up
The LUX is best set up when it is dark outside and the lights are on.
To do this turn the LUX control fully clockwise to '-' then slowly anti-
clockwise (towards '+') until the red LED turns on.
A: Wiring diagram
L N
Manual wall switch:
Optional for CEPH NO,
for override off.
Compulsory for CEPH RE,
to reset the photocell.
Back box or
BESA box
CESO or
CESO SQ
CEPH NO or
L
N SL
CEPH RE
(A)
B: Adjusting Lux
100
1000
max
min
LUX
Lamp
load