AFL Hyperscale 37RU Manuale di installazione - Pagina 9
Sfoglia online o scarica il pdf Manuale di installazione per Apparecchiature industriali AFL Hyperscale 37RU. AFL Hyperscale 37RU 20. Mass-fusion splice cabinets
Cable Installation
14.
Remove the cable tie bracket (E).
Strip cable jacket approx. 2.5m (8.2ft) according
16.
to cable manufacturer's guidelines.
20RU & 37RU Mass-Fusion Splice Cabinets
15.
Slide the hose clamp over cable end (K).
NOTE: 6 Way, up to Ø12mm cable tie
off bracket available - P/N: CTB612 -
max.4 per manifold allowing 24 cables
Fix the cable to the tie bracket (E) with the hose
17.
clamp (K). ALWAYS START IN THE REARMOST
POSITION.
© AFL Hyperscale. All rights reserved
9