deconta D 110L Manuale di istruzioni - Pagina 4

Sfoglia online o scarica il pdf Manuale di istruzioni per Caldaia deconta D 110L. deconta D 110L 14. Water treatment boiler system

2.1 Delivery
The unit is delivered on a pallet. To prevent effects of weather or damages, the unit is
wrapped in a plastic film.
Transport damages have to be documented at once during the handing over of the
carrier or another supplier. Please note the possible damages additionally on the way bill.
2.2 Transport
The Transport has to be handled with care to avoid damages due to faulty handling or
imprudence.
In winter and at risk of frost, you have to empty the whole device (pumps, filter housings,
tank.) preliminary to the transport.
Attention: Transport of the machine (also change of location) only with a drained device.
2.3 Storage
In order to avoid damages, the installation has to be kept in a dry area with no access for
unauthorized persons.
Because of risk of frost in winter you have to observe the following:
 Empty water pipes, filter housing and tank
 Place the water treatment system in a place protected against frost.
Advice for the draining of the tank: In order to drain, move the ball valve.
Instruction manual
Water treatment boiler system D 110 L

2 Transport und storage

Seite 4