IKEA IH8432WS0 Istruzioni per l'installazione e manuale d'uso e manutenzione - Pagina 9
Sfoglia online o scarica il pdf Istruzioni per l'installazione e manuale d'uso e manutenzione per Cappa di ventilazione IKEA IH8432WS0. IKEA IH8432WS0 32. Island canopy range hood
Electrical Shock Hazard
Electrically ground blower.
Connect ground wire to green and yellow ground wire
in terminal
box.
Failure to do so can result in death or electrical shock.
5=
Connect lamp and control panels cable connectors to the
blower motor connectors.
A
8. Use twist-on connectors and connect green or bare wire with
yellow-green wire.
9o Replace terminal box cover.
10. Check all light bulbs to make sure they are secure in their
sockets.
11. Reconnect power.
1=
Insert 3 screws on the bottom of the chimney structure (in
corresponding
position to the keyhole slots on the hood
canopy).
A
A, Three screws
2. Lift hood canopy so that the large end of the keyhole slots are
over the 3 screws on the bottom of the chimney structure.
3. Push the hood canopy so that the 3 screws are in the narrow
end of the keyhole slots. Securely tighten the screws.
4. Install the remaining 9 screws and securely tighten.
°
_
o
Front
A. Control panel connection
B. Lamp connection
6. Check lights and blower operation. See "Use and Care Guide"
section.
If hood does not operate:
m Check that the circuit breaker is not tripped or house fuse
blown.
m Disconnect power. Check that wiring is correct.
7. For non-vented (recirculating) installations, install the charcoal
filter. See "Use and Care Guide" section.
Install
Vent Covers
1. Insert captive nuts on the inside of the vent covers at all 14
rectangular hole locations.
2. Place the upper vent covers around the chimney structure so
that the vent slots on the front cover face the same direction
as the control panel.
.°. _,, .......
"%%°%
A. Upper vent covers