Kohler K-1124P Manuale di installazione - Pagina 14
Sfoglia online o scarica il pdf Manuale di installazione per Vasche da bagno Kohler K-1124P. Kohler K-1124P 48. Bath with airjets and integral apron canada
Anche per Kohler K-1124P: Manuale di installazione (48 pagine)
Confirm Proper Operation (cont.)
Press the power button on the user keypad.
Observe that the blower motor starts at a midrange speed.
Observe that air is blowing through all of the airjets.
Press the up button on the user keypad.
Verify that the air flow increases.
Press the down button on the user keypad.
Verify that the air flow decreases.
Press the power button on the keypad to stop the blower motor.
Confirm Manual Purge Operation
Drain the bath.
When the bath has drained, press the purge button once.
Observe that the blower motor starts at low speed and blows any residual water from the air
channels.
Observe that air comes out of the airjets.
Verify that pressing the purge button again stops the blower motor.
Press the purge button to restart the manual purge.
Observe that the blower motor stops automatically after about two minutes.
Confirm Automatic Purge Operation
Press the power button.
Press the power button again to turn off the blower. Note the time.
If filled, drain the bath.
Observe that the blower motor starts in the purge cycle after about 30 minutes.
Observe that the blower motor stops automatically after about two minutes.
1034593-2-F
14
Kohler Co.