Acano Solution Manuale di installazione - Pagina 8

Sfoglia online o scarica il pdf Manuale di installazione per Server Acano Solution. Acano Solution 17.

3 Hardware Installation

Note: From end November 2013 the Acano Server ships with two rack rails – and this guide
reflects that. The rack rails are not available for older Acano Servers: if you need an older
version of the Installation Guide contact [email protected].
1. Check that the rack sides are parallel and adjust them if necessary.
2. Open the Acano Server packaging; remove the two small boxes and then with another
person, using the handles provided, lift the server out of the box and onto a strong flat
surface.
3. Open the accessories box and find:
12 x M4 screws for fixing the ears and rails to the server
12 x M5 cage nuts and 12 x M5 screws for fixing the rails and ears into the rack
4. Lift the rack rails out of the packaging, noting the orientation in each case; that is, which end
goes at the front of the server.
5. Adjust the length of the rack rails to fit the depth of your rack. This may require repositioning
the two screws holding the rear bracket on each rack rail. Tighten the screws securely.
6. Separate the rack rail inner section (which fits to the server) from the rack rail outer section
using the release latch.
7. Screw one rack rail inner section to the appropriate side of the Acano Server using the
supplied M4 screws (see figure 3). Repeat for the other side.

Figure 3: Fitting inside rail components to the Acano Server sides

8. Using a Philips screwdriver fit the rack ears, one on each side of the server at the front using
the remaining M4 screws (see figure 3).
Acano solution: Installation Guide 76-1002-04-D
Hardware Installation
Page 8