360 Yield 360 Y-DROP JOHN DEERE 4830 Manuale di istruzioni - Pagina 8
Sfoglia online o scarica il pdf Manuale di istruzioni per Macchine agricole 360 Yield 360 Y-DROP JOHN DEERE 4830. 360 Yield 360 Y-DROP JOHN DEERE 4830 11.
INSTALL BREAKAWAY ASSEMBLY -
VI.
ONE PIECE
Figure 18
Step 1
Install breakaway assembly - one piece (1)
using the square U-bolts (2) and the extra
thick washer and Nylock nut. Repeat for
the remaining breakaway assemblies -
one piece.
Hardware Kit C
Figure 19
Figure 19 may show more or fewer mounts than
your installation. The alignment and quantity of the
mounts will depend on your row spacing.
Figure 20
Step 2
Install riser tube assembly (1) into the
breakaway assembly - one piece (2).
Step 3
Install pin (3).
Repeat Steps 2 and 3 for the remaining riser tube
assemblies.
NOTE: Included in most sprayer mount packages
are standard riser mounts to be used when primary
booms are folded and in transport mode. These
standard riser mounts should be mounted in
locations that allow you to relocate the drops away
from potential tire interference. See "Install Riser
Mounts Without Breakaway Assemblies" section on
next page for more instructions.
INSTRUCTIONS 360 Y-DROP
2
1
Figure 18
Figure 19
2
3
1
Figure 20
JOHN DEERE 4730/4830
360YIELDCENTER.COM
8