ABB M2305 Manuale - Pagina 6
Sfoglia online o scarica il pdf Manuale per Controllore ABB M2305. ABB M2305 14. Switch actuator
ABB-Welcome
Pos: 26 /Di nA4 - A nleitu ngen Onlin e/Ueb ersc hrift en/2 ./Bedie nakti onen @ 2 0\m od_ 1323 262 294 281 _15. docx @ 11 191 1 @ 2 @ 1
4.2
Operating modes
Pos: 71 /Di nA4 - A nleitu ngen Onlin e/Ueb ersc hrift en/3 ./Abschl usswide rsta nd @ 19\ mod _13 219 5807 990 6_1 5.do cx @ 1100 83 @ 3 @ 1
Pos: 72 /Di nA4 - A nleitu ngen Onlin e/In halt/KNX/Do orEnt ry/Bedie nun g/Abschl usswide rsta nd s etzen 83 220 -AP-xxx @ 19\ mod _13 1072 339 236 9_1 5.do cx @ 1 078 41 @ @ 1
4.2.1
Call repetition
Fig. 2:
Call repetition
No.
Functions
1
2->OFF, 3->OFF
Pos: 74 /Di nA4 - A nleitu ngen Onlin e/In halt/KNX/Do orEnt ry/Bedie nun g/M aste r/Slave Sc halte r setz en 832 20-AP-xxx @ 1 9\m od_1 310 723 320 966 _15. docx @ 10 783 3 @ @
The device is enabled for an incoming call to control an external bell or light.
The device is disabled after the call is answered or after a customized time-out (ranging
from 1 to 30 seconds).
The address of the switch actuator is equal to that of an indoor station in the same
apartment.
|
1
DIP
2 3
— 6 —