13. Install optional modules, if included in the delivery
14. Install the cover(s)
The cover installation procedure is the opposite of the removal procedure. Refer to
install the side plates shown in
15. Start up the drive
WARNING! Before you start up the drive, make sure that the installation is completed. Make sure also that it is safe
to start the motor. Disconnect the motor from other machinery if there is a risk of damage or injury.
WARNING! If you activate the automatic fault reset or automatic restart functions of the drive control program,
make sure that no dangerous situations can occur. These functions reset the drive automatically and continue
operation after a fault or supply break. If these functions are activated, the installation must be clearly marked as
defined in IEC/EN 61800-5-1, subclause 6.5.3, for example, "THIS MACHINE STARTS AUTOMATICALLY".
Use the control panel to do the start-up procedure. The two commands at the bottom of the display show the functions of
the two softkeys
and
depending on the context. Use the arrow keys
active view. Key
shows a context-sensitive help page.
?
1.
Power up the drive. Make sure that you have the motor name plate data available.
2.
The First start assistant guides you through the first start-up.
The assistant begins automatically. Wait until the control panel shows
the language selection screen.
Select the language you want to use and press
Note: After you select the language, it takes a few minutes for the
control panel to wake up.
3.
Select Start set-up and press
4.
To complete the first start assistant, select the values and settings
when prompted by the assistant. Continue until the panel shows that
the first start is complete.
When the panel shows that the first start is complete, the drive is ready
for use. Press
(Done) to enter the Home view.
5.
The Home view shows the values of the selected signals.
Connection procedure
before you install the cover.
located below the display. The commands assigned to the softkeys are different
,
,
(Next).
Remove the
and
to move the cursor or change values depending on the
(OK).
11
cover(s). In frames R6...R9,