1. [LOCK 4*PCS SCREW(M3*3-I) TO
FASTEN PCB SHIELD]
1.[FETCH BUTTON AND PUT IT IN
THE MIDDLE OF CONVEYER]
2.[FASTEN 2*PCS IO-NUT IN THE
M/B]
3.[INSERT UPPER CCFT CABLE IN
POWER/B]
1.[FETCH BUTTON&ITS
CABLE,THEN ASSEMBLE THEM]
2.[ASSEMBLE BUTTON/B AND
BEZEL]
3.[LOCK 3*PCS SCREW(F3*8-I) TO
FASTEN BUTTON/B ON THE BEZEL]
4.[STICK 1*PCS AL FOIL TO COVER
UPPER CCFT CABLE]
- 29 -