- ページ 8
リフティングシステム AussieCarHoists High-Lift Equipment YL-350WのPDF 設置および操作マニュアルをオンラインで閲覧またはダウンロードできます。AussieCarHoists High-Lift Equipment YL-350W 20 ページ。 Two post clear floor/base plate car hoist
Step4: Install the master column
(column with basement of power unit)
1. Check the dimension of the foot margin before installation to assure the baseboard of the column
align with the tailor's chalk line.
2. Use the holes on the baseboard of the column as formwork to drill holes on the concrete ground
(the drill must perpendicular to the ground). Guarantee the drilling depth (about 160mm), not freely
chambering and swing the electric drill.
3. Clean the dust in the hole after drilling and check if the baseboard of the column within the range
of the tailor's chalk line.
4. Knock the foundation bolt into the hole (screw the nut on the bolt, not to knock the bolt and nut
directly), till the washer contact with the baseboard.
5. If the column is not perpendicular to the ground, you should adjust the gap with thin washer.
When you assure the foundation bolt is screwed tighten, the column is perpendicular to the ground.
6. Screw the nut with spanner after the column is perpendicular to the ground, but not to screw
tightly for the moment.
Step5: Install slave post
Install the slave column in the position where lineation is finished, and then install the slave stand
column. (The step is same to the one for the master column) Screw the foundation bolt of the
master column and the slave column tightly and check the verticality of the column again at the
same time, otherwise you should adjust the verticality with the appropriate washer till it fits to the
requirement.