- ページ 7
試験装置 AFL MFISのPDF クイック・リファレンス・マニュアルをオンラインで閲覧またはダウンロードできます。AFL MFIS 17 ページ。 Multi-fiber identification system
Ensuring the MFI Proper Plunger Position
It is very important to properly position the MFI plunger for testing 250 & 900 µm
coated and ribbon fibers.
Remove the plunger cover and observe the plunger position.
•
Make sure the plunger is oriented correctly for the type of fiber to be tested.
•
If not, lift the plunger from the two retaining pins.
•
Rotate the plunger such that the correct side is facing out and will be used for the
•
fiber under test alignment.
Replace the plunger and cover.
•
The "250/900/RIB" side faces out for the 250 µm and 900 µm coated and ribbon
fibers testing
250 µm, 900 µm, Ribbon Fibers
7