- ページ 3
扇風機 AirFiciency CF60EのPDF マニュアルをオンラインで閲覧またはダウンロードできます。AirFiciency CF60E 4 ページ。 Heavy duty industrial ceiling fan
Figure 3
Once all electrical work has been done,
position the wiring back up into the ceiling
outlet box.
Lift and set the hanger ball into the mounting
plate socket by aligning the groove in the
hanger ball with the tab on the mounting
plate socket as shown in Figure 3.
Slide bell up to mounting plate and rotate to
align locking slots in bell with canopy screws.
Secure bell to mounting plate with canopy
screws. Lightly tighten the bell screw that
snugs the bell to the down-rod.
Bolts, flat washers, and fiber pads for attaching blades are located on the motor housing.
Brackets come already installed on blades.
Remove bolts and washers from fan motor.
Leaving fiber pad in place on motor housing, set blade bracket over holes and reinstall the bolts and
washers in their original holes as shown in figure 4. Tighten into motor housing. Do not over tighten.
Mounting continued
Hanger ball
Canopy screw
Alignment
groove
Bell screw
Attaching Blades
Figure 4
Figure 4
Bolts
Lock Washers
Flat Washer
Blade
Blade Bracket
Fiber Pad
Figure 3
Bell
Install fan blades based on
the direction of airflow you
intend to utilize the most.
For downward air flow
For upward air flow
All blades MUST face the
same direction.
Canopy screw
Mounting plate
socket
Alignment tab
Down-rod