- ページ 4

農機具 360 Yield 360 Y-DROP MILLERのPDF 取扱説明書をオンラインで閲覧またはダウンロードできます。360 Yield 360 Y-DROP MILLER 12 ページ。

INSTALL MOUNT ASSEMBLIES
II.
ON THE OEM PRIMARY BOOM
Figures 2 and 3
Step 1
With the threads pointing down, install
diamond U-bolt (1) on the top side of the
OEM primary boom.
Bag AM (5.75") - mounting locations containing
the added OEM gussets on primary booms
Bag AL (5.0") - mounting locations with no
added OEM gussets on primary booms
Step 2
Install diamond boom clamp (2) on the
bottom of the OEM primary boom.
Step 3
Install 14" top plate (3).
Step 4
Install bracket assembly (4) and flange
lock nuts (5).
Hardware Kit D
Step 5
Install carriage bolts (6) and flange nuts.
Hardware Kit D
Step 6
Install extension tube (7).
Figure 4
Step 7
Install boom bracket (1) onto the
extension tube.
Step 8
With the threads pointing down install
square U-bolts (2) plus the 5/16" extra
thick washers and the 5/16" nuts.
Hardware Kit A
Step 9
Install stop bolts (3) at both the front and
the rear of the extension tube.
Hardware Kit B
Figure 5
Step 10
Install stainless steel set screws and
jam nut assemblies (1) onto the bracket
assemblies.
Hardware Kit D
Repeat Steps 1-10 the remaining mount assemblies
on the OEM primary boom.
INSTRUCTIONS 360 Y-DROP
2
3
Figure 2
Figure 3
3
Figure 4
Figure 5
360YIELDCENTER.COM
MILLER
NEW HOLLAND
1
6
4
7
5
2
1
1
4