- ページ 11

包装設備 ALLpaQ Packaging Group Genesis SeriesのPDF オペレーター・ユーザー・マニュアルをオンラインで閲覧またはダウンロードできます。ALLpaQ Packaging Group Genesis Series 13 ページ。

ALLpaQ Packaging Group Genesis Series オペレーター・ユーザー・マニュアル
ALLpaQ Genesis 200E Only
Once the container is unfolded remove the padded detachable floor panel and place safely near
the unit avoiding any marked walkways.
Fig 2.6
This will reveal a steel frame in the collapsed position (Fig 2.6).
Lift frame and unfold legs to each corner of the container and ensure white legs are at the rear of
the container Fig (2.7)
Replace detachable padded floor panel (Fig 2.8) and container is ready for use.
3.3 Fitting the port position plate to the bag
The procedure for fitting the port position follows the same procedure for the 500L & 1000L
versions of the ALLpaQ Genesis range.
ALLpaQ recommend that all 3D bags used in conjunction with it bioprocess range of containers
should be fitted with a small plastic support disc when filled. Some bags may be pre fitted with a
similar disc however if this is not the case please contact ALLpaQ immediately before use.
For full instructions see 1.3
Fig 4.1
Fig 4.2
Fig 2.7
Front
3.4 Fitting the bag
Instruction applies for the ALLpaQ Genesis 200E (Fig 4.1)
and ALLpaQ Genesis 250 (Fig 4.2).
To access the container operator can reach over the side
panels to position the bag.
Feed the drain tubing through the hole in the base of the
container.
It may be helpful to pull the tubing through the front of the
base via the access door (Fig 4.2 inset).
Manual V1 - (Sept 14
th
Fig 2.8
Any tubes and clamps should be
closed/open in according to
manufacturers recommendations.
2012)