- ページ 13

無停電電源装置 Alpha Technologies Alpha Continuity 6KのPDF ユーザーマニュアルをオンラインで閲覧またはダウンロードできます。Alpha Technologies Alpha Continuity 6K 16 ページ。

4.

Batteries

4.1.

Battery Pack Discharge Times

Table 1 Continuity 6K – 7Ah/12V (x 20pcs)
Load (W)
1x BP Continuity
1080
1620
2700
3780
4320
5400
Table 2 Continuity 10K – 9Ah/12V (x 20pcs)
1x BP Continuity
Load (W)
1800
2700
3600
4500
6300
7200
4.2.

Storage Instruction

For extended storage in a moderate climate (-5 to +30 °C / 23 to +86 °F), the batteries should be charged for 12
hours every 6 months by plugging the UPS power cord into the wall receptacle. Repeat this every 3 months at
higher temperatures (+30 to +45 °C / +86 to +113 °F). Do not store batteries under conditions that are outside of
this range.
4.3.

Recycling Used Batteries

Contact your local recycling or hazardous waste center for information on proper disposal of
used batteries.
0320008-J0 Rev B
2x BP Continuity
6K
0:42:48
1:30:56
0:25:48
1:03:30
0:12:26
0:41:53
0:08:30
0:25:24
0:07:06
0:17:20
0:04:57
0:14:09
2x BP Continuity
10K
10K
0:30:33
1:15:11
0:16:50
0:53:52
0:12:27
0:41:58
0:10:12
0:27:55
0:06:28
0:15:46
0:04:52
0:13:55
3x BP Continuity
6K
6K
2:16:25
1:41:13
1:02:50
0:46:53
0:41:36
0:27:35
3x BP Continuity
10K
1:59:50
1:20:47
1:02:56
0:51:33
0:30:45
0:27:09
4x BP Continuity
6K
3:01:53
2:14:57
1:29:01
1:02:30
0:55:28
0:45:16
4x BP Continuity
10K
2:39:46
1:54:27
1:29:10
1:08:44
0:50:28
0:44:33
Page 9