- ページ 17

溶接システム ARCCAPTAIN CUT50のPDF ユーザーマニュアルをオンラインで閲覧またはダウンロードできます。ARCCAPTAIN CUT50 20 ページ。 Plasma cutter 50a

5. MAINTENANCE

5.1 Daily maintenance

WARNING
The power of the switching box and the cutting machine should be shut down
before daily checking (except appearance checking without contacting the
conductive body) to avoid personal injury accidents such as electric shock and
burns.
Tips:
1) Daily checking is very important in keeping the high performance and safe operation
of this cutting machine.
2) Do daily checking according to the table below, and clean or replace components
when necessary.
3) In order to ensure the high performance of the machine, please choose components
provided or recommended by dealer when replacing components.
4)
Items
Whether any of the components are damaged or loosely
connected;
Front panel
Whether the output quick sockets are tightened;
Whether the abnormity indicator illuminates.
Whether the input power cable and buckle are in good
Back panel
condition;
Whether the air intake is unobstructed.
Cover
Whether the bolts are loosely connected.
Side plates
Whether the side plate is loosely fixed.
Chassis
Whether the screws are loosely connected.
Whether the machine enclosure has color fading or
overheating problems;
Whether the fan sounds normal when the machine is
Routine
running;
Whether there is abnormal smell, abnormal vibration or
noise when the machine is running.
Digital Welder Expert, Know You More
Daily checking of the cutting machine
Checking requirements
14
Remarks
If unqualified,
check
the
interior of the
machine, and
tighten
or
replace
the
components.
If unqualified,
tighten
or
replace
the
components.
If abnormal,
check
the
interior of the
machine.
https://www.arccaptain.com