- ページ 21

サーバー Cisco UCS B250 M1のPDF インストールとサービスノートをオンラインで閲覧またはダウンロードできます。Cisco UCS B250 M1 34 ページ。 Extended memory blade server

Cisco UCS B250 M1 インストールとサービスノート
S e n d d o c u m e n t c o m m e n t s t o u c s - d o c f e e d b a c k @ c i s c o . c o m
Remove the heat sink (N20-BHTS2 for M1 models, N20-BHTS4 for M2 models). See
Step 2
2. Remove the old thermal compound from the bottom of the heat sink using the cleaning kit
(UCSX-HSCK) available from Cisco. Follow the instructions on the two bottles of cleaning solvent.
Unhook the socket latch. See
Step 3
Step 4
Open the socket latch. See
Step 5
Remove the CPU or socket protective cover. See
Figure 10
Installing a CPU or Heat Sink
Before installing a new CPU in a server, verify the following:
To install a CPU or heat sink, follow these steps:
Place the CPU on the base with the notches aligned to the pins on the base. See
Step 1
OL-22474-03
Figure
Figure
Removing the Heat Sink and Accessing the CPU Socket
The CPU is supported for that model server.
A BIOS is available that supports the CPU/DIMM and server combination.
The service profile for this server in UCS Manager will recognize and allow the new CPU. This is
especially important if you have been using a single processor and install a second processor.
Cisco UCS B250 Extended Memory Blade Server Installation and Service Note
Working Inside the Extended Memory Blade Server
10, callout 3.
10, callout 4.
Figure
10, callout 5.
Figure
10, callout
Figure
11, callout 1.
21