- ページ 5

コントローラー Acuity Controls nLIGHTのPDF ポケットマニュアルをオンラインで閲覧またはダウンロードできます。Acuity Controls nLIGHT 5 ページ。 Enabled digital luminaire
Acuity Controls nLIGHT にも: プログラミング手順 (2 ページ)

Acuity Controls nLIGHT ポケットマニュアル
DO'S & DON'TS - TIPS FOR SUCCESS
Here are some best practices to follow and some of the most common mistakes to
avoid. Keeping these tips in mind will help assure you a successful install.
DO use cable hangers.
DO run your CAT-5e cable at a 90-degree angle across
power lines when crossing cables is necessary. DO NOT
run CAT-5e parallel to or in close proximity to high
voltage cables or sources of interference. DO leave at
least 12" clearance from sources of line voltage.
DO terminate cables according to T568B.
DO make sure crimps are deep, straight and that the
blades penetrate the conductors evenly for proper
contact.
DO use a remote cable tester to verify each segment.
DO NOT use cables with strain-relief boots at
connectors. Some nLight devices have limited cabling
space that does not allow for boots.
DO protect CAT-5e connectors (bag and tie) and cover
open ports if construction is ongoing and connections
cannot be completed.
DO NOT use tape on connectors - residue from tape will
cause poor connections.
DO NOT leave excess cable coiled up. Cut cable to
appropriate length. DO leave a short service loop at the
end of each cable run.
DO NOT damage the jacket or overstress the
conductors.
DO NOT exceed 1500 feet CAT-5e per nLight Control
Zone.
DO check the port for debris or bent pins before
inserting connector.
DO seat the connector carefully and fully into the RJ-45
jack, observing which side has the clasp vs. pins. Insert
until locking hinge clicks to secure connector in port.
Need help? Contact Tech Support at 800-727-7483.
Comments or suggestions on this document?
© Acuity Brands, Inc. 06/15 Form 1412.033