- ページ 9
コントロールユニット Alemite 3620のPDF サービスマニュアルをオンラインで閲覧またはダウンロードできます。Alemite 3620 11 ページ。 Electronic-metered control valve
Electronic-Metered Control Valve
Electronic Meter Assembly
Refer to Service Guide SER 3630 for complete details.
Metered Control Valve
IMPORTANT: Apply thread sealant to all
pipe thread connections prior to assembly.
1. Screw Nipple (3) into Meter Assembly (2).
• Do not tighten at this time.
2. Screw Control Valve Handle Assembly (4) onto the
Nipple.
• Tighten the Nipple into the Handle and the Meter at
the same time.
• Make sure to align the Handle properly with the
Meter.
3. Connect the components of the extension assembly
and tighten securely.
4. Screw the extension assembly into Meter Assembly
(2).
• Tighten the extension securely.
Alemite LLC
1-800-548-1191-http://[email protected]
Figure 6
Control Valve Handle 339100 - Section View
Installation
Attach the Swivel Assembly [with thread sealant] to its
delivery line. Tighten the connection securely.
Operation
WARNING
Should leakage occur anywhere within the
system, disconnect power to the motor. Personal
injury can occur.
Safety and Latch
1. Squeeze the Lever to ensure the safety engages
properly.
2. Press the button in the center of the Lever and operate
the Lever. The Lever should move to the open
position.
3. Release the Lever (while pressing the button) then
release the button to ensure the latch engages properly.
4. Press the Lever and release to release the latch.
If the safety and/or latch does not operate properly,
refer to the Control Valve Troubleshooting Chart.
9
SER 3620
Refer to Figure 5 Parts List
for Parts Identification
Revision (11-05)