Astria Craftsman 42P3 설치 및 작동 지침 매뉴얼 - 페이지 11

{카테고리_이름} Astria Craftsman 42P3에 대한 설치 및 작동 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Astria Craftsman 42P3 20 페이지. Wood burning fireplaces

Astria Craftsman 42P3 설치 및 작동 지침 매뉴얼
If area above is an attic or insulated area, install
firestop above framed hole.
Figure 14 - Firestop Spacer with Attic Space Above Ceiling
IMPORTANT NOTICE
When penetrating a ceiling into an attic, a firestop
thimble (38FST or FST30) is required to avoid intru-
sion by insulation and recommended to negotiate a
joist (see Figure 14a).
Figure 14a - Firestop Thimble
PENETRATING ROOF
To maintain a 1" clearance to pipe on a roof with a pitch, a rectangular
opening must be cut.
1. Determine center point where pipe will penetrate the roof.
2. Determine center point of the roof. Pitch is the distance the roof
drops over a given span, usually 12". A 6/12 pitch means that the
roof drops 6" for each 12" measure horizontally down from roof
rafters.
3. Use roof opening chart (Figure 15) to determine correct opening
length and flashing required.
4. Remove shingles around opening measured. Cut out this section.
5. Add next sections of pipe until end penetrates roof line. Check to see
that proper clearances are maintained. Extend chimney by adding
sections of double wall pipe until pipe is minimum of 30" above
highest point of roof cutout. Termination and chimney must extend
a minimum of 36" above highest point where it passes through
roof.
126662-01D
VENTING INSTALLATION Continued
Thimble
38FST or
FST30
FLASHING INSTALLATION (V6F-8DM OR V12F-8DM)
Firestop
Determine flashing to be used with roof opening chart. Slide flashing
over pipe until base is flat against roof. Replace as many shingles as
needed to cover exposed area and flashing base. Secure in position
by nailing through shingles (see Figure 16). DO NOT NAIL THROUGH
FLASHING CONE.
Installing Flashing on a Metal Roof
When installing flashing on a metal roof, it is required that putty tape
be used between flashing and roof. Flashing must be secured to roof
using #8 x 3/4" screws and then sealed with roof coating to prevent
leakage through screw holes. A roof coating must also be applied
around perimeter of flashing to provide a proper seal.
Astria.US.com
Minimum Measurements
14
/
"
3
8
(48.3 cm)
1"
(2.54
cm)
1"
(2.54
cm)
Pitch
Slope
Opening
"A" Max.
Flat
0-6/12
26.6°
6/12- 12/12 45.0°
Figure 15 - Roof Opening Measurements
Storm Collar
Flashing
Cone
Nail Only Outer
Perimeter of
Flashing
Underlap Shingles
at Bottom
Figure 16 - Flashing Installation
30"
(76.2 cm)
1"
(2.54 cm)
Opening "A"
Used Flashing
Model No.
15"
V6F-8DM
16
/
"
V6F-8DM
1
8
20
/
"
V12F-8DM
3
8
Overlap
Shingles Top
and Sides Only
11