Baumer Hubner PMG10 설치 및 작동 지침 - 페이지 24

{카테고리_이름} Baumer Hubner PMG10에 대한 설치 및 작동 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Baumer Hubner PMG10 36 페이지. Absolute encoder ssi with magnetic sensing

Baumer Hubner PMG10 설치 및 작동 지침
ELECTRICAL CONNECTION / ELECTRICAL CONNECTION WITH RADIAL FLANGE CONNECTORS
5.8.2

Assignment flange connectors

)
Do not connect voltage supply to outputs! Danger of damage!
Please, beware of possible voltage drop in long cable leads (inputs and out-
puts)!
5.8.2.1
First flange connector [C]
SSI
Programming interface (only PMG10P)
Additional output incremental 1 (option)
Flange connector M23 (male, 17-pin, clockwise)
5.8.2.2
Second flange connector [D]
Additional output incremental 2 (option)
Speed switch (option)
)
Flange connector M23 (male, 12-pin, clockwise)
Additional output incremental (option)
1)
Speed switch (option)
2)
Programming interface (only PMG10P)
3)
21/29
PIN
1
8
1
9
2
10
12
2
7
3
6
3
11
4
5
4
5
6
7
8
9
The TTL/HTL output at the additional output incremental 2 is electrically
isolated and requires a separate power supply�
8
9
1
12
10
2
7
3
6
11
4
5
ASSIGNMENT
nE−
DIR
dnu / SB
3)
nE+
PRE
dnu / SA
3)
Ub
C+
C−
PIN
ASSIGNMENT
1
dnu / B−
1)
2
nE−
3
dnu / R+
1)
4
dnu / R−
1)
5
dnu / A+
1)
6
dnu / A−
1)
MB245EN - 11171693, 19A3, Baumer_PMG10-SSI_II_EN
PIN
ASSIGNMENT
10
0V
11
Internal shield
12
dnu / B+
1)
13 dnu / B−
1)
14
D+
15
dnu / A+
1)
16 dnu / A−
1)
17 D−
PIN
ASSIGNMENT
7
dnu / SP+
2)
8
dnu / B+
1)
9
dnu / SP−
2)
10
0V
1)
11
nE+
12
Ub
1)