Follett Horizon HMC1000ABT 설치 지침 매뉴얼 - 페이지 8

{카테고리_이름} Follett Horizon HMC1000ABT에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett Horizon HMC1000ABT 16 페이지. Ice storage bin top-mount applications
Follett Horizon HMC1000ABT에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (16 페이지), 설치 지침 매뉴얼 (16 페이지)

Follett Horizon 
HMC1000ABT 설치 지침 매뉴얼

Ice transport tube

5
Install the ice transport tube.
5.1
Hot Water
160 F (71 C)
• Install supplied ice transport tube insulation
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Connect ice transport tube to coupling on louvered docking station
• Connect ice transport tube to shuttle actuator
BIN • TOP-MOUNT
self-contained
8