Dreamline SHCM-2718-00 설치 매뉴얼 - 페이지 3
{카테고리_이름} Dreamline SHCM-2718-00에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dreamline SHCM-2718-00 8 페이지. Shower column
II.
Preparation
1. After opening the box, read this introduction carefully, check all the packed parts are complete
by cross checking of all the components. Examine for shipping damage. If the unit has been
damaged or has a finishing defect, please contact your local distributor within 2 business days.
Please note that Bath Authority™ / DreamLine™ will not replace any damaged product
or parts free of charge, ONCE the product has been installed. Your distributor's
responsibility for damage in transit is limited after the shower package has been transferred to
the transportation company, so you may have to contact the transportation company directly to
report damage. Contact your distributor or DreamLine if you have any questions.
2. You should consult your local building codes on questions on installation compliance
standards.
3. Install all of the required plumbing. Your plumber will need to supply with two ½" male
threaded pipes for hot and cold water outlets.
4. Use a competent and licensed (if required by local code) plumber for all plumbing
installation.
5. Please, note that there are some adjustments and drilling might be necessary during the
installation process.
3
Rev 1.1