DREAMS Deacon bed 조립 지침 매뉴얼
{카테고리_이름} DREAMS Deacon bed에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DREAMS Deacon bed 10 페이지. Solid/sprung slats
DREAMS Deacon bed에 대해서도 마찬가지입니다: 조립 지침 매뉴얼 (7 페이지)
Deacon bed
Assembly Instructions
NOTE: If you choose to purchase the
sleepmotion bed, please use this AI'
Before you
Start, here
are some
helpful
advices.
Revision number 1/1
BEFORE STARTING ASSEMBLY PLEASE REFER TO THE OWNERS MANUAL
SUPPLIED WITH YOUR SLEEPMOTION 200i BED BASE AND FOLLOW THE
INSTRUCTIONS TAKING NOTE OF ANY SAFETY PRECAUTIONS OR
OPERATIONAL SAFETY REQUIREMENTS OF THE INSTALLATION. BUILD THE
BED BASE FIRST USING ONLY THE EIGHT LONGER LEGS 6"(15cm),SEE
STAGE 1.IMPORTANT: PLACE THE BASE IN FINAL POSITION IN THE ROOM
OF USE, CONNECT THE POWER AND CHECK THE OPERATION THEN STEP
BY STEP FOLLOW THE BED ASSEMBLY INSTRUCTIONS BELOW, TO BUILD
THE BED AROUND THE SLEEPMOTION 200i BED BASE
1. We suggest you spend a short time reading through this leaflet and then follow
the simple step by step instructions.
2. If you follow the instructions carefully the end result should be worth the effort.
3. Do not discard any of the packaging until you have checked that you
have all the parts and the pack of fittings.
4. Assemble this product on a carpet.
5. To ensure an easier assembly, we strongly advise that all fittings are only
finger tightened during initial assembly. Only upon completion of the.
Assembly should all fixing points be fully tightened.
6. We recommend a periodic check on all fixing points to make sure they remain
fully tightened.
7. Keep glue and fittings out of children s reach.
In the unlikely event that this product has missing or damaged parts, please call
03442 920000 to obtain spares