Atlanta BYK 5415 매뉴얼 - 페이지 8

{카테고리_이름} Atlanta BYK 5415에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Atlanta BYK 5415 20 페이지.

Atlanta BYK 5415 매뉴얼

Start-up

3. Start-up
8
Unpacking:
Carefully open the packaging, remove the
smaller instruments before removing the
instrument itself. Make sure all components in
the component list are included.
Installation:
*Prior to installation, keep in mind that the
instrument must not be exposed to; excessive
heat or humidity, aggressive or corrosive
substances, fl ammable substances, or excessive
vibration
1. Place the instrument on a fi rm, hard and
level surface, strong enough to support its
weight without signifi cant vibration with
adequate access to the front and sides.
2. The power adapter is supplied with plugs
for various country requirements. Select the
plug suitable for your requirements. Insert
the power adapter into a suitable receptacle.
power adapter requirements are 100-240
VAC. Using the provided cable. Plug the
micro USB connector into the receptacle on
the rear panel.
3. Position the instrument with the LCD
towards the operator, leaving suffi cient
room to operate the two handles without
obstruction.
4. Unfold the two operating handles so they
snap in place.
5. Slide off the battery cover on the magnifying
glass. Insert the four AAA cells into the body
(see battery orientation indicated on the
cover).