DS Maref DVT-2600 서비스 매뉴얼 - 페이지 13
{카테고리_이름} DS Maref DVT-2600에 대한 서비스 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DS Maref DVT-2600 16 페이지.
8
MODE 8
9
MODE 9
10
MODE
10
while running. ·
Regarding the standard of the
discharge voltage, refer to the below
table.
minimum
average
18mmHg
23mmHg
- Check the performance of the air
pump
- The left number indicates the steps of
pump operation
- The right number indicates the
discharge voltage of pump while
running.
- The discharge voltage is 1 ~
30mmHg
- Separate AC Cord from outlet. Press
the Start key to make the battery wear
out. Leave the solenoid and pump
work together and wait until below
12.0V, press the start key to stop the
machine. Connect AC cord the machine
and wait for 10minutes. After
10Minutes, check the battery voltage
whether it went up or not.
- Connect the controller, hoses, and
sleeves.
Controller
- When press the start key, the air
pump put 100mmHg from the 1
channel on the first sleeve and wait for
10 seconds.
If the pressure after 10 seconds
becomes below 20%, the air leakage
can occur on sleeves.
maximum
28mmHg
Sleeve