Anzzi SB-AZ009WC 설치 및 운영 매뉴얼 - 페이지 10

{카테고리_이름} Anzzi SB-AZ009WC에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Anzzi SB-AZ009WC 14 페이지. Shower base
Anzzi SB-AZ009WC에 대해서도 마찬가지입니다: 설치 및 관리 매뉴얼 (8 페이지)

Anzzi SB-AZ009WC 설치 및 운영 매뉴얼
STEP 2
Place the tray into the designated position
so that the Drain Body drops around the
Drain Pipe and put the Shower Base up
against the studs.
Level the tray and place marks on the studs
above the upper edge of the tile flange.
If the subfloor is not flat and level, use
leveling compound or mortar bed to
ensure that the base is level (shown in Step 5).
(Fig 2)
STEP 3
Drill 3/16" holes at all stud locations on top
flanges.(Fig 3)
IMPORTANT: Drill 3/16" clearance holes
into flanges only. Do not drill 3/16" holes
directly into studs. Drill chuck can damage
base. Use an extended bit holder to reduce
risk of drill chuck hitting base.
Fig. 2
Fig. 3
8