Anzzi SB-AZ009WC 설치 및 운영 매뉴얼 - 페이지 10
{카테고리_이름} Anzzi SB-AZ009WC에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Anzzi SB-AZ009WC 14 페이지. Shower base
Anzzi SB-AZ009WC에 대해서도 마찬가지입니다: 설치 및 관리 매뉴얼 (8 페이지)
STEP 2
Place the tray into the designated position
●
so that the Drain Body drops around the
Drain Pipe and put the Shower Base up
against the studs.
Level the tray and place marks on the studs
●
above the upper edge of the tile flange.
If the subfloor is not flat and level, use
●
leveling compound or mortar bed to
ensure that the base is level (shown in Step 5).
(Fig 2)
STEP 3
Drill 3/16" holes at all stud locations on top
●
flanges.(Fig 3)
IMPORTANT: Drill 3/16" clearance holes
into flanges only. Do not drill 3/16" holes
directly into studs. Drill chuck can damage
base. Use an extended bit holder to reduce
risk of drill chuck hitting base.
Fig. 2
Fig. 3
8