Anzzi SB-AZ009WC 설치 및 운영 매뉴얼 - 페이지 8

{카테고리_이름} Anzzi SB-AZ009WC에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Anzzi SB-AZ009WC 14 페이지. Shower base
Anzzi SB-AZ009WC에 대해서도 마찬가지입니다: 설치 및 관리 매뉴얼 (8 페이지)

Anzzi SB-AZ009WC 설치 및 운영 매뉴얼
STEP 7
Allow the mortar to completely harden before applying weight to the bottom of the shower
tray.
Install the Drywall above the tile flanges and secure it to the studs.
Put the tiles (or other finishing wall material) over the drywall leaving 1/8" gap between the
bottom of the tile and the splash rim of the shower tray. Use caulk to fill that gap. (Fig.7)
Caulk
STEP 8
Apply a bead of sealant between the apron
and finished floor and wait for 24 hours
before using the shower. (Fig.8)
1
3
4
1/8"
gap
Base
Side View
Fig. 7
2
Waterproof Drywall to the
top of the tile flange
Stud
Drywall
Finished wall overlaps the
dry wall and tile flange
Fig. 8
2
e
6