Anzzi SB-AZ009WC 설치 및 운영 매뉴얼 - 페이지 8
{카테고리_이름} Anzzi SB-AZ009WC에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Anzzi SB-AZ009WC 14 페이지. Shower base
Anzzi SB-AZ009WC에 대해서도 마찬가지입니다: 설치 및 관리 매뉴얼 (8 페이지)
STEP 7
Allow the mortar to completely harden before applying weight to the bottom of the shower
●
tray.
Install the Drywall above the tile flanges and secure it to the studs.
●
Put the tiles (or other finishing wall material) over the drywall leaving 1/8" gap between the
●
bottom of the tile and the splash rim of the shower tray. Use caulk to fill that gap. (Fig.7)
Caulk
STEP 8
Apply a bead of sealant between the apron
●
and finished floor and wait for 24 hours
before using the shower. (Fig.8)
1
3
4
1/8"
gap
Base
Side View
Fig. 7
2
Waterproof Drywall to the
top of the tile flange
Stud
Drywall
Finished wall overlaps the
dry wall and tile flange
Fig. 8
2
e
6