Abus Vitess KNK 서비스 매뉴얼 - 페이지 12
{카테고리_이름} Abus Vitess KNK에 대한 서비스 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Abus Vitess KNK 20 페이지.
ASSEMBLY INSTRUCTIONS - RIM
Delivery of the pre-loaded housing
•
Our pre-loaded housing includes all parts that are necessary to
assemble a functional cylinder
•
Inside the cylinder there is a black plastic plug which has to be
exchanged by a pinned core
•
The housing is filled corresponding to the factory standard with
steel springs and housing pins
•
Additionally the following parts are included: tailpiece, core
retaining clip
Step 1
•
Insert the cut key into the cylinder core
•
Place the profile check pin in the core
Step 4
•
Position the pinned core with the
inserted cut key and rotate the core to
the 2 o'clock position
Step 7
•
Insert the tailpiece into the core and
push on the core retaining clip
12
Step 2
•
Insert the hardened InTop pin into the 1st
chamber
•
Attention: Pull the key a little and insert
it again
Step 5
•
Push the core inside until the plastic
plug has been pushed through
completely
•
Rotate the core forward clockwise until
the key is at the 12 o'clock position
Step 3
•
Insert the bottom pins made of hardened
steel into the 3rd chamber
•
Insert the bottom pins made of nickel silver
into the 2nd and 4th to 6th chamber
Only for master keyed systems: Insert master
wafers
•
Check with cut key – no pin should be
positioned too low or above the shear line
of the core – control with assembly tool
possible
Step 6
•
Remove the key by holding the core with
your thumb
•
The core isn't fixed yet and could be
pulled out with key inside