Apollo 7100 설치 매뉴얼 - 페이지 8

{카테고리_이름} Apollo 7100에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Apollo 7100 16 페이지. Residential & medium duty commercial slide gate operator

Four 1/2" anchor bolts (not supplied) are
recommended to mount the chassis. The
holes should be drilled with a 1/2"
concrete drill bit.
STEP 1. Set the operator on the pad as shown. Align the sprockets 3 to 5 inches from the inside
surface of the gate.
STEP 2. Mark the four mounting holes on the pad.
STEP 3. Remove the operator and drill the holes according to the anchor bolt manufacturers in-
structions.
STEP 4. Replace the operator and fasten to the pad.
Chain path
(Make sure
the chain
path clears
all posts and
obstacles).

OPERATOR INSTALLATION

TOP VIEW
3"- 5"
7
Mounting
Holes (4)