AFL Hyperscale 20RU 설치 매뉴얼 - 페이지 18

{카테고리_이름} AFL Hyperscale 20RU에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AFL Hyperscale 20RU 20 페이지. Mass-fusion splice cabinets

Standoff Bracket Assessory Installation
5.
Partially screw in the top mounting-plate
screws.
7.
Screw in the bottom screws and tighten the
top screws.
18
© AFL Hyperscale. All rights reserved
6.
Hang the mounting plate.
8.
Cable pass-through.
Recommended Minimum
Distance Between
Cabinets;
Cables up to Ø23mm
(.91") - 250mm (9.8")
gap
Cables over Ø23mm
(.91") - 500mm (19.7")
gap
The cable can pass
through, behind the
splice trays, into the wall
cabinets above or below.